The season starts Friday between Nova Levante and Passo Costalunga. Also scheduled are the König Laurin gondolas and the Paolina chairlift.
At Carezza, the lifts are scheduled to open on Friday 4 December. Planned for opening day are the gondola between Nova Levante and Frommer Alm, both sections of the König Laurin and, on the Passo Costalunga side, the Paolina chairlift. The Tires cable car and the Tschein chairlift are also scheduled for the same day.
Snow is already visible beneath the Catinaccio. On Monday 23 November, the ground around the top station of the König Laurin was white with snow, with the snow-covered Latemar opposite. Toward the pass, the pistes run across open slopes. From Frommer Alm, on the Nova Levante side, the runs drop back through the fir trees.
From Frommer, the König Laurin climbs toward the Fronza alle Coronelle refuge at the foot of the rock faces. The second section ends in a station built into the mountainside. On the opposite side, at Passo Costalunga, the Paolina serves the runs below the refuge of the same name, laying out the lifts between the pass dividing South Tyrol and Trentino and the woods above Nova Levante.
The season calendar also includes the Snowboard World Cup, expected on Thursday 17 December with the parallel giant slalom on Pra di Tori, the piste on the pass side. Skiers arriving for the first days on the snow already find the Pra di Tori chairlift and the Hubertus gondola on the schedule in that sector.
The schedule for Carezza’s individual lifts runs until 29 March 2027. The Carezza lift dates allow skiers to follow the openings toward the Catinaccio and those on the pass side.


No comments yet